Mubasher: Kuwait National Petroleum Company (KNPC) has listed a tender for the construction works of its planned Dabdaba solar energy project, Construction Week Online said.
This solar project is part of Kuwait’s strategy to produce 15% of its power needs from renewable sources.
KNPC offers a limited tender for the supply, construction, operation, and maintenance of the 1.5GW Dabdaba solar energy project, Construction Week Online added.
The tender closes on 16 December 2018, with a preliminary meeting set for 10 October, the day before the first preparatory meeting.
A second preparatory meeting will be held on 14 November, with a third set for the day after, Construction Week Online said, according to the tender filing.